Gamma Progression ST II 소유자 매뉴얼 - 페이지 9

{카테고리_이름} Gamma Progression ST II에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gamma Progression ST II 17 페이지.
Gamma Progression ST II에 대해서도 마찬가지입니다: 소유자 매뉴얼 (19 페이지)

Gamma Progression ST II 소유자 매뉴얼
STRINGING THE FRAME
Clamp Base Operation
Rotate the Base Locking Lever clockwise to secure the
clamp base to the turntable.
Reverse the clamping procedure to unlock the string
clamp. The Locking Lever is spring loaded to assist the
unlocking of the clamp base.
The Locking Lever should be tightened enough to pre-
vent clamp base slippage on the turntable, when the
desired tension is placed on the string. To go from the
loose position to the clamped position and back, gener-
ally requires the rotation permitted by the slot in th clamp
base. If the rotation is not sufficient to allow smooth
operation of, adjust the Clamp Base Locking Nut as
outlined on page 13.
Clamping the First Main String
To begin stringing the main strings, thread the two ends
of the string through the two center holes at the appro-
priate end of the frame and continue through the oppo-
site center holes. Thread one end of the string through
the adjacent grommet hole and pull excess by hand.
Secure one of the strings using a string clamp.
Pulling Tension
Wrap the loose section of string once around the roller
guide and insert the string between the diamond dust
coated string gripper plates. Pull the string perpendicu-
lar to the gripper plates while slowly rotating the
tensioner crank clockwise until the brake lever pops
out of the latching block. The string is now tensioned
and can be clamped in place with the remaining fixed
clamp.
Repeat the above steps until all main strings are
installed. Tie off ends of main strings as per racquet
manufacturers recommendations.
8