Centurion D2 Turbo 설치 매뉴얼 - 페이지 7

{카테고리_이름} Centurion D2 Turbo에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Centurion D2 Turbo 9 페이지. Domestic sliding gate operator theft-resistant nut and padlock kit
Centurion D2 Turbo에 대해서도 마찬가지입니다: 포켓 설치 매뉴얼 (13 페이지), 포켓 설치 매뉴얼 (2 페이지), 설치 매뉴얼 (2 페이지)

Centurion D2 Turbo 설치 매뉴얼
PFA: The Pillar Light relay will activate for two seconds before gate movement occurs, as well as during gate movement. This means gate movement will be delayed for a period of two seconds after a trigger has been received
PFB: The Pillar Light relay will only activate during gate movement
High Speed: Gate will operate at its maximum speed – typically 24 metres per minute
Low Speed: Gate will operate at 16 metres per minute
If Backup to Backup Memory Module or Restore from Backup Memory Module are required, remove ENCODER/ORIGIN connector and fit CP108 (Backup Memory Module)
Any controllers not marked with 'BACKUP' and 'RESTORE' do not support this function
E-4 and E-5 text is not screened on the BETA versions