LAR200(12.8V 200Ah LiFePO4 battery)User manual
**Note: the battery MUST get a fully charge and discharge cycle then you can get an accurate battery capacity**
2. Check before use
When the customer receives the battery, first check whether the battery is damaged, cracked,
or corroded; connect to Bluetooth, check whether the battery is in normal condition on the
mobile phone APP., and ensure that there is no damage during transportation. If there is any
abnormality, please stop installation and use immediately then notify us.
3. Installation
Before installation, make sure that the cables and terminals are kept clean to avoid any
corrosion, dirt or deposits.
Please confirm whether the battery voltage matches the battery charger and load before
installation.
Select wires, cables and terminals with appropriate specifications and sizes that meet the
standard, and ensure that the positive and negative connections are correct; tighten the
wires, cables and terminals to ensure that they are firmly fixed to reduce the resistance
between the DC terminal and the cable connection.
If the batteries need to be used in series or parallel, please fully charge the batteries before
installation. The maximum number of batteries in series is 4 groups, and the number of
batteries in parallel is recommended to be no more than 10 groups. The allowable number in
series and parallel is as follows:
When there is a necessary to connect the battery in series or parallel, please
Fully Charge
the batteries before installation. The maximum number of batteries in series is 4 groups, and