Airflow Uno hab 설치 키트 - 페이지 13

{카테고리_이름} Airflow Uno hab에 대한 설치 키트을 온라인으로 검색하거나 PDF를 다운로드하세요. Airflow Uno hab 16 페이지. Cavity wall decentralised mechanical ventilation with heat recovery unit
Airflow Uno hab에 대해서도 마찬가지입니다: 설치 및 운영 지침 매뉴얼 (16 페이지), 지침 (2 페이지), 유지 관리 매뉴얼 (2 페이지)

CHAPTER 7
WIRING DIAGRAM
OVERVIEW
© Airflow - we reserve the right to make changes without prior notice
7.0
Wiring diagram SD-3
Unohab
- / GND M2...
- / GND M1...
- / GND
12V=
Operation with 2 x Unohab units and 1 x Unohab PSF (Power supply flush mounted)
Unohab: M1 - start cycle: supply
M1
rt bl vi
Operation with up to 6x Unohab units and 1x Unohab PSF (Power supply flush mounted)
Unohab: M1 - start cycle: supply
Unohab PSF*
*Max. 6x Unohab units per 1x
PSF.
For 8x Unohab, 2x PSF
should be connected in
parallel. Please refer to wiring
diagram SD-4.
1,5 mm²,
Alternatively PSD can be
max. 4 m
used. Please refer to wiring
diagram SD-4.
Unohab Controller
Unohab Cavity Wall Installation Kit
8 9 10 11
7
6
5
+
4
1 2
External contact
Unohab: M2 - start cycle: extract
red / +12VDC
blue / - GND
violet / PWM
Unohab PSF
UP-Dose
+
230 V~ /
12 V =
-
3
1,5 mm²,
max. 4 m
2
UP-Dose
7
8 9 10 11
10
6
6
-
5
8
4
+
1 2
Unohab Controller
6 - GND
M5
M3
M1
8 - + 12V
10 - PWM Start Supply
11 - PWM Start Extract
3
3
3
6
UP-Dose
+
230 V~
230 V~ /
12 V =
-
UP-Dose
2
7
8 9 10 11
6
-
5
4
+
1 2
13
Installation and Operating Instructions
H3
H6
H2
H5
H1
H4
S1
S2
M2
rt bl vi
- Recommended Cable J-Y(ST) Y 0.8 mm 2 -
Maximum distance between Unohab Controller
and Unohab motor: 30m
230 V~
3
9
7
11
Unohab: M2 - start cycle: extract
M2
M4
3
3
Distributor
8
10 11
Recommended Cable J-Y (ST) Y 0.8 mm 2
-
-
Maximum distance between Unohab Controller and Unohab
motor: 30m
-
All motors connected to Distributor
-
Max. distance from Unohab Controller to Distributor: 4m
fig.22
M6
3
SD-3