Gantner GAT NET.Controller S 7000 F/ISO 매뉴얼 - 페이지 3
{카테고리_이름} Gantner GAT NET.Controller S 7000 F/ISO에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gantner GAT NET.Controller S 7000 F/ISO 5 페이지. Control unit for the gat net.lock 7000
Installation
The GAT NET.Controller 7000 master and slave controllers must be installed
in the vicinity of the connected GAT NET.Lock 7000 locks to keep cable
lengths to a minimum. Usually the controllers are stored on top of the
lockers.
Although the permanent fixing of the controllers is not required, when a
controller is to be permanently mounted, e.g., on a wall, use the 3 screw
holes provided in the base of the controller. The housing does not have to
be opened for this process.
Measurements for installation
4.8 mm
(0.19")
154.8 mm (6.09´´)
Installation process
1. Drill three mounting holes based on the measurements in the diagram
above. Depending on the supporting surface, use the appropriate drill
diameter for the screws and/or wall plugs (screws to max. M4).
2. Screw in the top two screws approximately half way.
3. Mount the controller housing on the top screws and push down until
the housing stops against the screws. Tighten screws if necessary.
1.
2.
4. Screw the third screw into the bottom mounting hole and tighten firmly.
1.
2.
5. Ensure the controller is secured firmly and cannot be removed.
www.gantner.com
270.5 mm (10.65´´)
154.8 mm (6.09´´)
309.6 mm (12.19´´)
3.
Valid from September 15
4.8 mm
(0.19")
2015 • Technical data subject to modification without notice!
th
DB_GAT-NETCONTROLLER7000--EN_23.indd • Part No.: 573835
3