Airflow DUPLEXBASE PT 2800 설치, 사용 및 유지 관리 매뉴얼 - 페이지 9

{카테고리_이름} Airflow DUPLEXBASE PT 2800에 대한 설치, 사용 및 유지 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Airflow DUPLEXBASE PT 2800 16 페이지. Air handling units

The unit must be secured against movement.
·
4.5.

Ductwork connections

·
Connect the HVAC duct following the design documentation. Make sure that the air exhausted at
i2 does not return back to the fresh air supply e1.
·
Air duct must be connected to inlet ports in a way that a uniform flow rate is achieved in the whole
cross-section of inlet ports.
·
A straight air duct being at least 1 m long must be firmly connected to extraction ports to achieve a
uniform flow rate in the whole cross-section of extraction ports.
A duct being at least 2 m long must be always connected to fan outlets to prevent injury caused by
·
the fan's impeller. This duct must be connected in such a way that it can be dismantled only by
using tools.
4.6.

Connecting the condensate drain pipe

The unit is equipped by two condensate outlets; these are used depending on whether an
·
integrated cooler is installed and what unit orientation is selected.
Use of condensate drains, Duplexbase PT without integrated cooler
9