deconta AS 300 매뉴얼 북 - 페이지 5
{카테고리_이름} deconta AS 300에 대한 매뉴얼 북을 온라인으로 검색하거나 PDF를 다운로드하세요. deconta AS 300 15 페이지. Waste water filtration unit
3.1 Delivery
If no other agreements have been made, the unit is packed safely and will be delivere d
ex work. Transport damages have to be documented immediately upon delivery by the
carrier or another supplier. Please note the possible damages additionally on the way bill.
The Transport is to be proceeded with care to avoid damages by improper handling or
carelessness.
3.2 Transport
It is important to avoid exposure to violent shocks, otherwise the function and safety of
the unit cannot be guaranteed.
In winter and at risk of frost, the whole unit (waste water pump and filter housing) needs
to be emptied before transport.
3.3 Storage
In order to avoid damages, the installation has to be kept in a dry area with no access for
unauthorized persons.
Because of risk of frost in winter you have to observe following:
Empty out water pipes and filter housing
Empty out water pump through discharging screw
Place the waste water filtration plant in a place protected against frost.
Ventilation connection
Drain screw
Guide book
AS 300 G
3 Transport
Seite 5