Green motion PIPISTREL SKYCHARGE Solo 기술 문서 매뉴얼 - 페이지 4
{카테고리_이름} Green motion PIPISTREL SKYCHARGE Solo에 대한 기술 문서 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Green motion PIPISTREL SKYCHARGE Solo 17 페이지.
SKYCHARGE – TECHNICAL DOCUMENTATION
Page 4
2 INSTALLATION
2.1 Mounting
Fix the charging station on the column requires a minimum of two people.
Fix the column on the concrete base with 4 threaded rods M10 according to the following diagram.
Do not forget the flat washers.
Electrical introduction is done through the left opening size 100x50mm with 1600 mm cable.
Bottom view:
Electrical introduction
Concrete base :
A concrete base have to be settled before
receiving the charger with the following
dimensions : 700 x 400 x 150 mm
Electrical cable