Green motion SMART ONE 기술 문서 매뉴얼 - 페이지 9
{카테고리_이름} Green motion SMART ONE에 대한 기술 문서 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Green motion SMART ONE 12 페이지.
SMART ONE – TECHNICAL DOCUMENTATION
Page 9
The termination resistance can be activated on the SMART ONE by putting a plug on "J15" and on "J14".
On the PRIVATE ONE charging station, the CAN bus cables is connected onto the terminals 17 (CAN+)
and 18 (CAN-):
This schema may vary according to the controlled P1 charging station.