Berner AE08 설치 및 유지 관리 지침 매뉴얼 - 페이지 5

{카테고리_이름} Berner AE08에 대한 설치 및 유지 관리 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Berner AE08 16 페이지.

Berner AE08 설치 및 유지 관리 지침 매뉴얼
III. WALL MOUNTING
A.
PREPARATION
1.
Locate the wall mounting hangers, mounting catch
and hook, in the carton that contained the unit.
See Figure 4. For units over 72", there are more than
two wall hangers.
2.
Use ¼"-20 bolts, provided by Berner, to attach the
mounting catch and hook to the back of the air
curtain.
3.
The mounting hardware (supplied by others) must
be capable of supporting a minimum of three times
the net weight of the Air Curtain. See Weight Chart,
Table 1.
MOUNTING WALL HANGERS
B.
1.
Position the wall hangers evenly over door opening,
no more than 6" from each end of the air curtain,
sliding to match the location of support structure.
2.
Using minimum ¼"-20 bolts (supplied by others),
secure the wall hangers to the supporting structure.
C.
ATTACHING THE AIR CURTAIN TO THE WALL HANGERS
1.
Raise the unit over the door (air discharge nozzle
facing down) and onto the wall mounting hangers.
See Figure 5.
2.
Rotate the unit into place, allowing it to rest above
the lower lip of the wall hanger and add the locking
screws (one per wall hanger).
Proceed to Section V - ELECTRICAL CONNECTIONS
3.
IV. SUSPENDED MOUNTING
NOTE: if the unit was ordered with a decorative rear
cover, the air curtain will arrive with the cover already
installed, and the wall mounting hangers, mounting catch
and hook will not be included in the shipment. Contact
Berner if they are required.
A.
For top mounting using suspension rods, four (4) factory
installed 1/4"-20 threaded inserts are located on the top of
the unit. See Figure 6.
B.
Install 1/4"-20 threaded rods, or other suitable hardware at
a location sufficient to support the Air Curtain. The
mounting hardware (supplied by others) must be capable
of supporting a minimum of three times the net weight of
the Air Curtain. See Weight Chart, Table 1.
C.
Attach 1/4"-20 threaded rods, or other suitable hardware
to the top mounted threaded inserts. Secure threaded rods
with locking nuts.
D.
Proceed to Section V – ELECTRICAL CONNECTIONS
HOOK
CATCH
WALL HANGERS*
(Position evenly; slide to match
location of support structure)
*Longer units use more than two wall hangers.
Position outer wall hangers no more than 6" from the end.
Figure 4 - Wall Mounting Preparation
Figure 5 - Wall Mounting Installation
Figure 6 - Suspended Mounting
-5-
1/4"-20 BOLTS provided by Berner
(4 FT-LBS RECOMMENDED TORQUE)