Combustion air supply
In order for the stove to perform efficiently and safely there must be an adequate air supply into the room in
which the stove is installed to provide combustion air. The provision of air supply to the stove must be in
accordance with current Building Regulations Approved Document J. An opening window is not appropriate
for this purpose. If it was necessary to fit a draught stabilizer due to excessive chimney draught then attention
must be paid to the permanent combustion air requirements as this will be different as detailed in Approved
Document J.
Connection to chimney
All the stoves have a choice of either rear or top flue gas connector that allows connection to either a masonry
chimney or a prefabricated factory made insulated metal chimney in accordance with the instructions. It may be
necessary to fit an adaptor to increase the diameter of the flue to the required 150 mm section of the chimney or
liner.
Material Clearances
The stove can be recessed in a suitable sized fireplace but a permanent free air gap of at least 150mm must be
left around the sides and top and at least 50mm at the back of the stove to obtain maximum heat output and for
access to the rear of the stove.
All non-combustible walls closer than 400mm to the stove should be at least 75mm thick. In all instances the
back wall of the fireplace recess and the hearth should be made of non-combustible material. Allow an apron of
at least 300mm at the front of the stove and 150mm on either side. The hearth on which the stove is to be placed
should not be less than 125mm thick and should be in accordance with the current building regulations.
Care should be taken to level the stove using the adjusting screws in the feet.
The appliance shall be installed on a floor with adequate load-bearing capacity. If the existing construction does
not meet this prerequisite, suitable measures (e.g. load disturbing plate) should be taken to achieve it.
Safety Distances from Combustible Surfaces:
Green 8
Green 10
Green 20
Green 25
Green 30
Sides
Rear
200mm
200mm
200mm
200mm
200mm
200mm
200mm
200mm
200mm
200mm