EXAMPLE OF BASIC INSTALLATION OF GREEN
TOILET LUX
Green Toilet Lux is installed on two levels:
The porcelain pedestal is placed to the
bathroom and the Green Toilet composting
unit below the floor level to a cellar or outside
to the basement. It is important to ensure
that the waste pipe goes straight vertically
down from the pedestal.
The ventilation is led from the composting
unit outside to the roof level. The electrical
duct fan can be installed anywhere in the
ventilation line. The fan is protected against
dripping water, so it can be placed outdoors
(classification IPX2). However, the fan will last
longer if it is installed into a dry space.The
ventilation pipe can also be led out through a
wall and curves are allowed. If you are using
the electrical duct fan, only a ventilation pipe
hat is needed on the top to prevent the rain to
flow in (included in the package).
If there is no electricity available, then a wind
fan is highly recommended, and the ventila-
tion pipe should go up as straight as possible
without making any curves.
The seap liquid, ie. the excess liquid that
comes out of the composting unit, can be led
to a canister or to a GeoTrap Dry Toilet Filter.
We' r e here to help!
Contact us if you have any questions about the installation of Green
Toilet Lux. You can also send us pictures of the installation site. We are
happy to advise on the right implementation.