CORNING Pretium EDGE ETM-5B-Q 설치 및 테스트 - 페이지 9

{카테고리_이름} CORNING Pretium EDGE ETM-5B-Q에 대한 설치 및 테스트을 온라인으로 검색하거나 PDF를 다운로드하세요. CORNING Pretium EDGE ETM-5B-Q 9 페이지. Tap module

CORNING Pretium EDGE ETM-5B-Q 설치 및 테스트
9.3
Table 3 provides a complete guide to the testing sequence for testing with the Light Source at the "B"
module ("Far end") and a meter at Tap module "A" ("Near end" ) of the system as shown in Figure 12.
Source LC Position at "B"
B-2
B-4
B-6
B-8
B-10
B-12
9.4
To test the odd-numbered ports at the front of the Tap Module, switch the "Near" and "Far" locations of
the Light Source/RJ1 and M1/RJ2. At the end of the Tap cable assembly, move the LC adapter on M2/RJ3 to
connector number 2 (Figure 12).
"Near end"
RJ2
Tap Module "A"
0.00 dB
M1
HPA-0761
9.5
To complete the testing of the first Tap module, save or record each fiber's measurements as you
follow the sequence shown in Table 3.
9.6
Repeat the steps in this section on the remaining Tap modules.
Corning Cable Systems LLC • PO Box 489 • Hickory, NC 28603-0489 USA
1-800-743-2671 • FAX +1-828-325-5060 • International +1-828-901-5000 • http://www.corning.com/cablesystems
Corning Cable Systems reserves the right to improve, enhance, and modify the features and specifications of Corning Cable Systems' products without prior notification.
Pretium EDGE is a registered trademark of Corning Cable Systems Brands, Inc. MTP is a registered trademark of USConec, Ltd. All other trademarks are the properties of
their respective owners. Corning Cable Systems is ISO 9001 certified.
©2012 Corning Cable Systems. All rights reserved. Published in the USA.
STANDARD RECOMMENDED PROCEDURE 003-126 | ISSUE 1 | OCTOBER 2012 | PAGE 9 OF 9
Meter no.1 LC Position at "A":
A-1
A-3
A-5
A-7
A-9
A-11
Link under test
Tap port test harness
RJ3 and adapter
2
12
0.00 dB
M2
Meter no. 2 -TAP Port Test Harness
2
4
6
8
10
12
multimode only
Pretium EDGE
Module "B"
Table 3
"Far end"
RJ1
Light Source
Figure 12