CORNING Pretium 운영 매뉴얼 - 페이지 5

{카테고리_이름} CORNING Pretium에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CORNING Pretium 10 페이지. Rack-mountable 1u housing hardware

Bracket Orientation for Top Cable Entry
3.5.2
Using Cable Ties
If at least 10 m (33 ft) of outside plant cable is routed within an environmentally controlled building
where temperature fluctuation is minimal, securing the cable sheath is adequate strain-relief.
CAUTION: Wear safety glasses to protect your eyes from accidental injury when
handling chemicals and cutting fiber. Pieces of glass fiber are very sharp and can
damage the eye easily.
CAUTION: Wear safety gloves o protect hands from accidental injury when using
sharp instruments.
Step 1:
Attach the cable to the strain-relief bracket with cable ties in two places as shown in
Figure 6.
Step 2:
Allow room on the bracket to strain-relieve the cable strength member, if present.
STANDARD RECOMMENDED PROCEDURE 003-649 | ISSUE 5 | JANUARY 2009 | PAGE 5 OF 10
Yarn (If Present)
Strength Member
Flat Washer
U-shaped
Washer
Bracket Orientation for Bottom Cable Entry
Cable Ties
KPA-1197
KPA-1196
Figure 5 — Strain-relieve Using UCC
Figure 6 — Strain-relieve Strength Member