A&E Bath and Shower VISTA-V 설치 매뉴얼 - 페이지 5
{카테고리_이름} A&E Bath and Shower VISTA-V에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. A&E Bath and Shower VISTA-V 16 페이지. Shower column 5
PREPARATION
Adjust the plumbing to ensure that there
is adequate space for the shower to be
installed. (fig.1)
Establish the precise height and position
of the unit on the wall. We recommend
to leave a 10'' (25 cm) space between
the shower head and the average height
of the people in the house as well as a
minimum distance of 1'' (2.5 cm) from
the ceiling. (fig.2)
Hot
Chaud
Caliente
fig.1
Center to center
Centre à centre
Centro a centro
Max 5 5/8'' (14 cm)
PRÉPARATION
Vérifier et ajuster la plomberie pour
qu'elle soit disposée adéquatement.
(fig.1)
Établir la hauteur et la position exacte de
l'unité sur le mur. Nous recommandons
de laisser un espace de 10'' (25 cm)
entre la tête de douche et la hauteur
moyenne des utilisateurs dans la maison
ainsi qu'une distance minimum de 1''
(2.5 cm) du plafond. (fig.2)
½ "
Ajustar al tubería para asegurar que
existe suficiente espacio para la ducha
al instalar (fig. 1).
Establecer la altura y la posición precisa
de la unidad en la pared. Recomendamos
dejar un espacio de 25 cm (10 pulg)
entre la cabeza de la ducha y la altura
promedio de las personas en la casa al
igual que una distancia mínima de 2.5
cm (1 pulg) desde el techo (fig.2).
1"
MIN.
(2.5 cm)
RECOMMENDED
Cold
RECOMMANDÉ
RECOMENDADO
Froid
10"
Fría
(25 cm)
fig.2
PREPARACIÓN
5