Documentation Updates (Continued)
TABLE 2
Title
SPARC Enterprise
M8000/M9000 Servers
Site Planning Guide
SPARC Enterprise
M8000/M9000 Servers
Site Planning Guide
SPARC Enterprise
M8000/M9000 Servers
Installation Guide
Page Number
1-12
In section 1.2.2 (System Installation, Space), the following
information has been added:
"The minimum ceiling height for the SPARC Enterprise
M8000/M9000 Server is 2.3m (7.5 feet), measured from the true
floor or a raised floor, whichever is higher. The space above the
server and its surroundings must not restrict the movement of
cooling air between the air conditioner and the server."
2-4
In section 2.2 (Electrical Specification), the following
information has been added:
"SPARC Enterprise M8000/M9000 Servers can use two types of
power supply: single-phase power and three-phase power.
Redundant power cables are supported only on servers that
have the dual power feed option. The dual power feed option is
included by default on servers that are configured for three-
phase power."
"Note: Power cables are not redundant on single power feed
servers without the dual power feed option. On servers that
have single power feed, all power cables must be connected and
powered on at all times."
2-4
In section 2.2.2 (Facility Power Requirements), the following
information has been added:
"SPARC Enterprise M8000/M9000 Servers can use two types of
power supply: single-phase power and three-phase power.
Redundant power cables are supported only on servers that
have the dual power feed option. The dual power feed option is
included by default on servers that are configured for three-
phase power."
"Note: Power cables are not redundant on single power feed
servers without the dual power feed option. On servers that
have single power feed, all power cables must be connected and
powered on at all times."