Fujitsu PRIMERGY S10 매뉴얼 - 페이지 7

{카테고리_이름} Fujitsu PRIMERGY S10에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Fujitsu PRIMERGY S10 45 페이지. Storage subsystem

1

Introduction

The demand for storage capacity that is capable of scalable growth and the
increasing trend towards rack-based servers have generated a need for corre-
spondingly compact and powerful backup systems with a correspondingly
serious approach to data security.
The PRIMERGY S10 storage subsystem provides a flexible means of consoli-
dating rack-based data security. The PRIMERGY S10 makes it possible to
install present-day backup units (such as, for example, DLT 7000, DDS3,
DDS4, Autoloader, etc.) in a separate 19" cabinet and provides two 3.2"-high or
four 1.6"-high slots for this purpose. The subsystem is also prepared to accom-
modate future back up units.
The subsystem offers a simple, flexible and low-priced solution for avoiding
backup constraints and facilitating expansion.
The PRIMERGY S10 can be connected via onboard controllers or Adaptec
2940 U2W. The storage subsytem has been equipped with an LVD interface
module.
The LVD interface module accommodates the control and display elements and
the logic for controlling the power supply and monitoring the fan. It also estab-
lishes a connection between the external and internal cabling. All the necessary
connectors for the internal cabling are located on this module (socket for the
power supply, for the fan connector, and for the internal SCSI line), as well as
the socket for the external SCSI output (see also section "Connecting the
storage subsystem" on page 20). An LVD/SE SCSI terminator is integrated in
the interface and is automatically activated on the last subsystem in the string if
no SCSI connection to another storage subsystem exists (no daisy-chain).
Up to two PRIMERGY S10 can be connected to a SCSI string.
The storage subsystem is cooled by a fan. The fan is monitored to make sure it
does not fall below the nominal speed. If the "Local/Remote" switch is set to
"Remote", the storage subsystem is switched off in the event of an error, or the
system is prevented from being switched on again, as appropriate (see also
chapter "Troubleshooting" on page 25).
The PRIMERGY S10 storage subsystem possesses an integrated power
supply unit.
The PRIMERGY S10 occupies three height units (3 HU) in the 19" rack.
1
U41181-J-Z156-1-74