Kohler VEIL BEAM SR D/BN 설치 지침 매뉴얼 - 페이지 21
{카테고리_이름} Kohler VEIL BEAM SR D/BN에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler VEIL BEAM SR D/BN 30 페이지. Wall-hung toilet
4) It is ready to use when connected to water supply after
installation.
Note:
Reserve access panel at front or top of the tank in
remote installation.
4)
2. K-23055T-PNE installationn
2. K-23055T-PNE
1)
Suggested faceplate fixed frame installation direction
1)
2)
Connect air hose to faceplate from water tank
2)
3)
Insert faceplate into faceplate fixed frame with half flush
upward. Installation is completed.
3)
4) It is ready to use when connected to water supply after
installation.
Reserve access panel at front of the tank in remote
installation.
4)
5)
How to remove.
5)
1
Push Up
2
Pull Out
3
Pull Out
1402749-T01-A
Full Flush
Button
.
.
-14-
Up
Half Flush Button
Full Flush Button
1
Half Flush Button
Air Hose
Faceplate
3
2