Kohler VIA K-20649T-BW 설치 지침 매뉴얼 - 페이지 9

{카테고리_이름} Kohler VIA K-20649T-BW에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler VIA K-20649T-BW 11 페이지. Vitreous china wall-hung p-trap toilet
Kohler VIA K-20649T-BW에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (30 페이지), 설치 지침 매뉴얼 (24 페이지), 설치 지침 매뉴얼 (28 페이지)

Kohler VIA K-20649T-BW 설치 지침 매뉴얼
3. Cut box
Cut the excessive part of the box as shown.
4. Install valve assembly
Fix valve assembly onto inlet and outlet pipes with wrench as
shown in Fig.5.
Fix onto inlet pipe
·
Process inlet pipe thread and fix inlet pipe connector.
·
Put seal onto the nut.
·
Tighten valve assembly and inlet connector with wrench.
Fix onto outlet pipe
·
Put nut and seal onto outlet pipe.
·
Tighten valve assembly and outlet connector with wrench.
Note:
Clean waste in the supply pipe before fixing inlet pipe.
1299535-T01-C
Seal
G1 Inlet Nut
G1
Inlet Pipe(Not Supplied)
(
)
3.
Fig.4
4
4.
5
·
·
·
·
·
Valve
Nut
Seal
Outlet Pipe(Not Supplied)
(
)
Fig.5
5
-3-