Kohler Finial K-316 설치 및 관리 매뉴얼 - 페이지 15
{카테고리_이름} Kohler Finial K-316에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Finial K-316 28 페이지. Bidet faucet
Kohler Finial K-316에 대해서도 마찬가지입니다: 설치 매뉴얼 (48 페이지)
9.
Connect the Supplies
Valve Inlet
Entrée de valve
Entrada de la válvula
Supply Tube
Tuyau d'alimentation
Tubo de suministro
Connect the supply tubes to the valve inlets and then to the shut-off valves. Left is
hot and right is cold.
Tighten all connections.
Raccordement des alimentations
Connecter les tuyaux d'alimentation aux entrées du robinet, puis aux robinets de
sectionnement. Chaud à gauche et froid à droite.
Serrer toutes les connexions.
Conecte los suministros
Conecte los tubos de suministro a las entradas de la válvula y luego a las llaves
de paso. El lado izquierdo corresponde al agua caliente, y el derecho, al agua fría.
Apriete todas las conexiones.
10.
Complete the Installation
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Adjust as needed.
Turn the spray assembly down.
Open both hot and cold valves and run water for about a minute to remove
debris. Check for leaks.
Turn the faucet off.
Kohler Co.
Valve Inlet
Entrée de valve
Entrada de la válvula
Supply Tube
Tuyau d'alimentation
Tubo de suministro
Shut-off Valve
Arrêt d'alimentation
Llave de paso
15
1144567-2-A