Kohler Freshman K-4989-T 설치 매뉴얼 - 페이지 4

{카테고리_이름} Kohler Freshman K-4989-T에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Freshman K-4989-T 20 페이지. Urinal
Kohler Freshman K-4989-T에 대해서도 마찬가지입니다: 유지 관리 매뉴얼 (9 페이지)

Kohler Freshman K-4989-T 설치 매뉴얼
12-1/2"
3/4"
(31.8 cm)
Spud
19-1/4"
(48.9 cm)
2" NPS
Tap
6-3/4"
17-1/4"
(17.1 cm)
(43.8 cm)
Roughing-In Dimensions (Rear Spud)
• Roughing-In remains the same when using the optional 3" outlet
spud.
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary
to conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing for the wall hangers as needed.
1020646-2-C
16-1/4"
(41.3 cm)
10" (25.4 cm)
14-1/4"
(36.2 cm)
24"
(61 cm)
24"
(61 cm)
1/4" (6 mm)
4
35-1/2"
(90.2 cm)
To Floor
2" NPS Tap
6" (15.2 cm)
Outlet Detail
Kohler Co.