Kohler Jarves K-5057 설치 매뉴얼 - 페이지 3

{카테고리_이름} Kohler Jarves K-5057에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Jarves K-5057 17 페이지. Urinals
Kohler Jarves K-5057에 대해서도 마찬가지입니다: 유지 관리 매뉴얼 (9 페이지), 유지 관리 매뉴얼 (10 페이지)

Kohler Jarves K-5057 설치 매뉴얼

Roughing-In Dimensions

• * The urinal complies with ADA requirements when the rim is
mounted no higher than 17" (43.2cm) from the finished floor.
• (T) Drain is typically 11-7/8" (30.2cm).
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary to
conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing as needed.
2. Install the Urinal
Install the hangers according to the roughing-in illustration.
Apply thread sealant tape to the pipe threads and install the female
collar to the waste pipe.
Place the gasket onto the female collar with the beveled surface
facing away from the collar.
Kohler Co.
3
1020644-2-A