Kohler K-10240 설치 및 관리 매뉴얼 - 페이지 23
{카테고리_이름} Kohler K-10240에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-10240 50 페이지. Showerheads
Kohler K-10240에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (17 페이지)
2-7/16"
(62 mm)
3-3/4" (95 mm)
1. Prepare the Site
Provide a 2-7/8" (73 mm) to 3-1/8" (79 mm) diameter hole in the
wall material for the plaster guard.
Route a 3/4" mixed water supply line to the transfer valve
location.
Apply thread sealant to the inlet port threads and connect the
water supply to the valve inlet.
Two-Way: If two accessories will be attached to the valve, go to
the "Two-Way Installation" section.
Three-Way: If three accessories will be attached to the valve, go
to the "Three-Way Installation" section.
Kohler Co.
Plaster Guard
Max
Finished
Wall
Inlet
Mixed Water
Min
Supply 3/4" Copper
Finished
Tubing or Piping
Wall
3
1205548-2-B