Kohler K-1246 설치 매뉴얼 - 페이지 5

{카테고리_이름} Kohler K-1246에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-1246 44 페이지. Bath whirlpool
Kohler K-1246에 대해서도 마찬가지입니다: 주택 소유자 매뉴얼 (32 페이지), 러프인 매뉴얼 (4 페이지), 설치 매뉴얼 (48 페이지), 러프인 매뉴얼 (4 페이지), 설치 매뉴얼 (48 페이지)

Kohler K-1246 설치 매뉴얼

1. Prepare the Site

NOTICE: Unless otherwise specified, floor support under the whirlpool must provide for a minimum of
80 lbs./square foot (390 kg/square meter) loading.
NOTICE: Do not support the whirlpool by the rim.
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is
flat and level.
The whirlpool should be installed in a drop-in installation. Construct 2x4 or 2x6 stud framing
designed for your particular installation. Provide for a 1/16" (2 mm) gap between the bottom of the
whirlpool rim and the stud framing. Frame the floor, or construct a frame for a raised installation in
accordance with the roughing-in information packed with the whirlpool.
Carefully lay out and cut the rough deck material. Use the cut-out template if one is provided, or
refer to the roughing-in cut-out information.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.

2. Prepare the Whirlpool

Install the drain to the whirlpool according to the drain manufacturer's instructions. Do not connect
the trap at this time.
Position a clean drop cloth or similar material in the bottom of the whirlpool. Be careful not to
scratch the surface of the whirlpool.
Kohler Co.
Position the rough
plumbing.
Construct 2x4 or 2x6
stud framing according
to the roughing-in
information.
Provide a 1/16" (2 mm) gap
between the whirlpool rim
and framing.
Frame the floor
according to the
roughing-in information.
Verify that the subfloor
offers adequate support,
and is flat and level.
5
1010914-2-D