Kohler K-13674 설치 매뉴얼 - 페이지 7
{카테고리_이름} Kohler K-13674에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-13674 33 페이지.
Battery Lead
Connection
Faucet Lead
Connection
Circuit
Board
5. Control Unit Connections
Install the straight connector onto the control unit.
Determine the length of the electrical tubing required to run
between the faucet and the straight connector on the control unit.
Cut the electrical tubing to length (as needed).
Push the faucet lead wire through the electrical tubing.
Push the electrical tubing end into the straight connector on the
control unit and tighten the straight connector.
Connect the faucet lead wire to the circuit board. The electrical
tubing may be tied to the faucet supply hose with the cable ties
provided.
Install the 4 D-Cell alkaline batteries (provided) as shown. Note
the polarity shown on the battery holder and make sure that the
battery lead is connected securely to the circuit board.
Kohler Co.
Straight Connector
7
Electrical
Tubing
1031173-2-B