Kohler Symbio K-1335-H 설치 매뉴얼 - 페이지 4
{카테고리_이름} Kohler Symbio K-1335-H에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Symbio K-1335-H 32 페이지. Bath whirlpool
Construct 2x4
stud framing
according to the
roughing-in
information
1. Prepare the Site
NOTICE: Unless otherwise specified, floor support under the whirlpool must provide for a minimum of 80
lbs./square foot (390 Kg./square meter) loading.
- Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is flat and level.
- The whirlpool should be installed in a corner installation. Construct 2x4 stud framing designed for your
particular installation. Frame the floor, or construct a frame for a raised installation in accordance with the
roughing in information packed with the whirlpool.
- Position the plumbing according to the roughing in information packed. Cap the supplies, and check for leaks.
2. Prepare the Whirlpool
- If this installation requires a receptor, install it now according to the instructions included with the receptor.
- Install the drain to the whirlpool according to the drain manufacturer's instructions. Do not connect the trap at
this time.
- Position a clean drop cloth or similar material in the bottom of the whirlpool. Be careful not to scratch the surface
of the product.
A
1012312-2-
Verify that the subfloor
offers adequate support,
and is flat and level
4
Kohler Co.