Kohler Vintage K-7159-PB 설치 매뉴얼 - 페이지 4

{카테고리_이름} Kohler Vintage K-7159-PB에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Vintage K-7159-PB 21 페이지. Bath drains

Overflow Tube
Coupling
Nuts
Gaskets
Drain
Tee
Elbow
Tailpiece
Through-the-Floor
Installations
2. Assemble Drain Elbow and Overflow Tube
- Assemble coupling nuts and tapered gaskets (note proper position
above) on overflow tube and drain elbow.
- For through the floor installations, the threaded portion of the tee
points toward the floor. For above the floor installations, the
threaded portion of the tee points away from the drain elbow, as
shown above.
- Align parts with the tee in the proper configuration for your
installation. Make sure the drain elbow tube is facing the front of the
bath. Insert tubes completely into the tee and hand tighten the coupling
nuts.
- Tighten the drain elbow securely by inserting pliers handles into the
top of the strainer. The handles will engage the tabs inside the strainer
as it is turned into the drain elbow.
- Remove any excess sealant.
A
1018153-2-
Overflow Tube
Coupling
Nuts
Gaskets
Drain
Tee
Elbow
Above-the-Floor
Installations
4
Tailpiece
Kohler Co.