Kohler Archer K-1125 설치 매뉴얼 - 페이지 6

{카테고리_이름} Kohler Archer K-1125에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Archer K-1125 21 페이지. Flanged acrylic bath with integral apron
Kohler Archer K-1125에 대해서도 마찬가지입니다: 사양 (2 페이지), 설치 및 관리 매뉴얼 (29 페이지), 설치 및 관리 매뉴얼 (25 페이지)

Kohler Archer K-1125 설치 매뉴얼

6. Complete the Installation

NOTE: Models with an integral apron are designed so the finished wall material [1-1/2" (3.8 cm)
maximum] will overlap the apron columns. The finished floor material [2" (5.1 cm) maximum] should butt
up against the apron.
Carefully remove the protective tape from the bath rim.
If necessary allow for deck mounted valves and spout.
Seal the joints between the bath rim edges and the water-resistant wall material with silicone
sealant. Tape and mud the water-resistant wall material.
Install the finished wall. Seal the joints between the bath rim and the finished wall with silicone
sealant.
Install the faucet trim according to the faucet manufacturer's instructions.
Clean-Up Procedures
CAUTION: Risk of product damage. Do not allow cleaners containing petroleum distillates to remain
in contact with the surface for long periods of time.
CAUTION: Risk of product damage. Do not use abrasive cleaners, as they may scratch and dull the
bath surface. Use warm water and a liquid, non-abrasive detergent to clean the surface.
CAUTION: Risk of product damage. Do not use metal scrapers, wire brushes, or other metal tools to
remove stains, paint, plaster, or tar. Use turpentine or paint thinner to remove stains, paint, or tar. Use
a powder-type detergent on a damp cloth to provide mild abrasive action to any residual plaster.
Clean and rinse the bath completely with water immediately after applying cleaners. Rinse and dry
any overspray that lands on nearby surfaces.
1014139-2-D
Water-Resistant
Wall Material
Bath
Framing
Finished
Wall
Apply silicone
sealant to the
joint between the
bath and the
finished wall.
6
Kohler Co.