Kohler BIOVE K-8277T 설치 지침 매뉴얼 - 페이지 7

{카테고리_이름} Kohler BIOVE K-8277T에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler BIOVE K-8277T 9 페이지. Enameled cast iron bath

C. Finish Bath Area Construction
NOTE: An access panel is essential for future
maintenance.
Possible framing arrangements are illustrated below.
Use the framing construction appropriate for your
particular bath model. Some modifications may be
needed for other types of construction, if preferred.
If an apron wall without a ledge is desired, the finished
apron wall surface must be 2 mm under the bath rim.
Recommended For Drop-in Models
1). Corner Installation
The suggested framing construction is illustrated.
1).
2). Recess Installation
The suggested framing construction is illustrated.
2).
3). Peninsular Installation
The suggested framing construction is illustrated.
3).
D. Install the Grip Rail (If with grip rail holes)
Install the grip rail on the bath according to the grip rail
manufactuer's instructions.
1046553-T01-B
C.
2mm
Service Access
Framing
Construction
Service Access
Framing
Construction
Service Access
Framing
Construction
D.
(
7
Finished Wall
Wall
Finished Wall
Wall
Finished Wall
Wall
)