Kohler Iron Works Tellieur K-727 설치 및 관리 매뉴얼 - 페이지 6
{카테고리_이름} Kohler Iron Works Tellieur K-727에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Iron Works Tellieur K-727 29 페이지. Freestanding cast iron bath
Kohler Iron Works Tellieur K-727에 대해서도 마찬가지입니다: 설치 매뉴얼 (25 페이지)
Drain
End
Assembly
Dowels
Barrel Nut
Note: Drain end assembly installation shown. For the curved end piece
installation, substitute the curved end piece for the drain end assembly.
5. Install the Wood End Pieces
Press the barrel nuts into the holes in the drain end assembly with a flatblade screwdriver. Make
sure each barrel nut head is flush with or slightly below the surface of the wood.
Carefully fit the drain end assembly against the outriggers and onto the dowels.
Press the drain end assembly fully against the outriggers to eliminate any gaps.
Insert the connecting bolts so they fit through the outrigger holes.
Thread the bolts into the barrel nuts.
Use the provided hex wrench to turn and tighten the connecting bolts to secure the drain end
assembly to the outrigger leg.
Repeat for the curved end piece.
1207306-2-A
Drain End
Assembly
6
Drain End
Assembly
Dowels
Outrigger
Barrel Nut
Connecting
Bolt
Hex
Wrench
Outrigger
Kohler Co.