Kohler K-1123 설치 매뉴얼 - 페이지 5

{카테고리_이름} Kohler K-1123에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-1123 21 페이지. Flanged acrylic bath with integral apron
Kohler K-1123에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (29 페이지), 설치 및 관리 매뉴얼 (25 페이지)

Kohler K-1123 설치 매뉴얼
4. Secure the Bath to the Stud Framing
Drill a small pilot hole through the nailing–in flange at each stud location. Add shims between the
nailing-in flange and the studs as needed to eliminate any gaps.
Nail 1/4" (6 mm) thick furring strips to the studs to shim out to the edge of the nailing-in flange.
Use #6 large-head galvanized nails or screws to secure the nailing-in flange to the studs.

5. Install the Plumbing

CAUTION: Risk of property damage. Make sure a watertight seal exists on all bath drain connections.
Connect the trap to the drain according to the drain manufacturer's instructions.
Install the faucet valving according to the faucet manufacturer's instructions. Do not install the
faucet trim at this time.
Open the hot and cold water supplies and check all connections for leaks.
Run water into the bath and check the drain connections for leaks.
Fill the bath to the overflow and check for leaks.
Kohler Co.
Nail 1/4" (6 mm)
thick furring strips
to the studs.
Stud
Use #6 large-head
galvanized nails to secure
the nailing-in flange to the
studs.
Drill a small hole
through the nailing-in
flange at each stud.
5
1014139-2-D