Kohler K-1148 설치 매뉴얼 - 페이지 11
{카테고리_이름} Kohler K-1148에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-1148 44 페이지. Bath whirlpool
Kohler K-1148에 대해서도 마찬가지입니다: 주택 소유자 매뉴얼 (32 페이지), 설치 매뉴얼 (48 페이지), 러프인 매뉴얼 (4 페이지), 설치 매뉴얼 (48 페이지)
Turn the jet trim ring
clockwise to
decrease the flow.
Turn the jet trim ring counterclockwise
to increase the flow.
9. Test Run the Whirlpool
Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
Fill with water 2" (5.1 cm)
above the highest jet.
Position the jet
nozzles to direct
the water flow as
desired.
Press the air actuator to turn
on and off the whirlpool.
11
1010914-2-D