Kohler System II K-809 설치 매뉴얼 - 페이지 4
{카테고리_이름} Kohler System II K-809에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler System II K-809 28 페이지. Drop-in bath whirpool
Construct 2x4 or 2x6
stud framing according
to the roughing-in
information
1. Prepare the Site
NOTICE: Unless otherwise specified, floor support under the whirlpool must provide for a minimum of 80
lbs./square foot (390 Kg./square meter) loading.
NOTICE: Do not support the whirlpool by the rim.
- Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is flat and level.
- The whirlpool should be installed in a drop in installation. Construct 2x4 or 2x6 stud framing designed for your
particular installation. Provide a 1/16" (2mm) gap between the whirlpool rim and the stud framing. Frame the
floor, or construct a frame for a raised installation in accordance with the roughing in information packed with
the whirlpool.
- Use the roughing in cut out information to carefully lay out and cut the rough deck material.
- Position the plumbing according to the roughing in information packed. Cap the supplies, and check for leaks.
2. Prepare the Whirlpool
- Install the drain to the whirlpool according to the drain manufacturer's instructions. Do not connect the trap at
this time.
- Position a clean drop cloth or similar material in the bottom of the whirlpool. Be careful not to scratch the surface
of the product.
B
1011606-2-
Position
the rough
plumbing
Provide a 1/16" (2mm) gap
between the whirlpool rim
and the framing
Frame the floor
according to the
roughing-in
information
Verify that the subfloor
offers adequate support,
and is flat and level
4
Kohler Co.