Kohler Veil K-8331T-0 설치 및 관리 매뉴얼 - 페이지 3
{카테고리_이름} Kohler Veil K-8331T-0에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler Veil K-8331T-0 12 페이지. Lithocast gloss freestaning bath
Finished Floor
1. Prepare the Site
NOTICE: Provide adequate floor support.
NOTICE: Measure your product for site preparation.
Determine the location of the bath.
Make sure that the subfloor offers adequate support for the bath.
Ensure that the subfloor is level.
IMPORTANT! To ensure a successful installation, install the bath on a level finished floor.
Position and install a standard PVC or brass drain pipe. Install the drain pipe so it extends above the finished
floor - "X" dimension. Refer to the product specification sheet for the "X" dimension.
Bath Model
"X" Dimension, above the floor
K-8331T-*
16mm Min – 19mm Max
K-8333T-*
16mm Min – 19mm Max
K-8336T-*
16mm Min – 19mm Max
Drain Flange
Flange Gasket
Drain Gasket
Nut
1-1/2" Drain Pipe
Dia. 70mm
12mm under floor
Apply 100% silcone
sealant to both sides.
Apply 100% silcone
sealant to both sides.
3
X
1329949-T01-B