Kohler ADAIR K-4983T-CM 설치 지침 매뉴얼 - 페이지 6

{카테고리_이름} Kohler ADAIR K-4983T-CM에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler ADAIR K-4983T-CM 9 페이지. 4.2l skirted class five+ one-piece toilet, s-trap 305/400mm

Kohler ADAIR K-4983T-CM 설치 지침 매뉴얼
Install the tank lid and the seat. Use
the supplied hardware pack for seat.
Periodically check for leaks for several
days following the installation.
FILL FLOAT WITH
BALLAST
Test flush the toilet.
Periodically check all connections for
leaks for several days following
installation.
Set the tank cover in place on the tank.
MINOR ADJUSTMENT OF

WATER LEVEL

Move the snap along "OPEN" direction.
To lower water level: Move water cup
down to a proper height and rotate
screw anticlockwise to achieve the
desired water level. (Refer to float
adjustment instructions.)
1259054-T01-A
Fig.#13
13
Fig.#14
14
Snap
SCALE
5:1
Fig.#15a
15a
Screw
Fig.#15b
15b
-6-
OPEN