Kohler K-22529T-BNS2 설치 지침 매뉴얼 - 페이지 3

{카테고리_이름} Kohler K-22529T-BNS2에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-22529T-BNS2 9 페이지. China floor standing toilet
Kohler K-22529T-BNS2에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (21 페이지)

Kohler K-22529T-BNS2 설치 지침 매뉴얼
TOOLS AND MATERIALS REQUIRED (NOT
SUPPLIED)
·
254mm (10") adjustable wrench
·
305mm (12") pipe wrench
·
Tape measure
·
Level
·
Drill (10mm. Drill bit)
·
Screwdriver
·
Plastic connector (Supplied)
·
Toilet installation bolt (Supplied)
·
S-TRAP 1206391(Optional)/P-TRAP 1036901 (Supplied)
ROUGHING-IN
Reference Value
Finished Wall
380
352
185
85
Finished Wall
358
350
155

INSTALLATION

1. Install Flushing Mechanism
1-1. Install The Tank
1) Turn the water supply off before installing the new toilet.
2) Install the concealed tank system in wall before decorating
the wall.
3) Install the tank system per tank's installation instructions.
1-2. Install Manual Valve Or Sensor
Refer to installation instructions of manual valve or sensor for
the installation of flushing mechanism.
1204812-T01-E
550
C
L of Inlet
C
L of Outlet
Floor Fixings
215
Kohler reserves the right to change marked dimensions without prior notice.
·
254
·
305
·
·
·
(
10mm)
·
·
(
·
(
·
S
1206391(
55
102
Finished Wall
185
1036901
P-Trap
Fig.#1
1
1.
1-1.
1)
2)
3)
1-2.
-3-
)
)
)/P
1036901(
)
Inlet
Outlet
Finished Wall
90-110
1206391
S-Trap(Optional)
(
UNIT: mm
)