Kohler 150EFOZC 설치 지침 매뉴얼 - 페이지 10

{카테고리_이름} Kohler 150EFOZC에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler 150EFOZC 12 페이지.

1
1. Remove pipe plug and install coolant temperature
sender (GM50536)
2. Remove pipe plug and install 45_ elbow (267428) and
oil pressure sender (GM51459)
Figure 16 Sender Location, Typical
(80--99EOZD/EOZC and
70--80EFOZD/EFOZC Models)
1
1. Remove pipe plug and install oil pressure sender
(GM51459)
2. Remove reducer bushing and petcock and install
coolant temperature sender (GM50536)
Figure 17 Sender Location, Typical
(125--180EOZD/EOZC and
100--150EFOZD/EFOZC Models)
10
5.
Note: See Figure 18.
2
5.1
5.2
5.3
JM-250000B-V
5.4
2
5.5
JY-250000B-S
Connect the control wiring kit:
GM51368-KP1 (33- -99 kW) or
GM51368-KP2 (100- -180 kW)
Connect the 24-pin (P1) connector from the
control wiring kit to the 24-pin connector on the
remote extension harness.
Connect leads C10, C11, C12, and C13 from the
control wiring kit to the TB12 (current transformer)
terminal block. See Figure 6.
Connect leads 5A and N from the control wiring kit
to the new coolant temperature sender (installed
in Section 4).
Connect leads 7C1 and N from the control wiring
kit to the new oil pressure sender (installed in
Section 4).
Make the remaining control wiring connections:
5.5.1 Lead N connects to the main controller
board's TB2 terminal strip at location 3.
5.5.2 Lead 47 connects to the main controller
board's TB2 terminal strip at location 4.
5.5.3 Leads V0, V7, UP, and LOW connect to the
TB3 terminal strip (located inside the
controller).
5.5.4 Lead 70 connects to the TB10 terminal
strip (located inside the junction box).
5.5.5 Leads 101 and 102 connect to the
controller's voltmeter.
5.5.6 Leads N/N (eyelet terminal) connect to the
controller's ground location.
TT-1501
9/12