Kohler 12RESL 설치 매뉴얼
2.6.5

Battery Charger

A 6-amp battery charger is factory-installed in the
battery compartment. The battery charger's DC leads
are factory-connected. The battery charger is required
in order to keep the engine starting battery fully charged.
Plug the battery charger's power cord into the 120 VAC
receptacle inside the air intake compartment.
Section 2.6.2 for instructions to connect power to the
receptacle. Refer to the generator set operation manual
for battery charger operation information.
Main Distribution Panel
(Normal Source)
2-Pole
Feeder Breaker
N
See
Connection
Detail
Transfer Switch with Load Center
(100 amp model shown)
Figure 2-18 Transfer Switch Connections
TP-6397 4/07
See
Connection Detail, Engine Start Leads
to ATS Main Logic Board P2 Connector
GRD *
NL1
NL2

2.7 Transfer Switch Connections

Connect the engine start leads and power cables from
the generator wiring kit to the transfer switch. See
Figure 2-18 and the wiring diagrams in Section 3.
Follow the instructions in ATS Operation/Installation
Manual TP-6345 for transfer switch installation,
operation, test, and maintenance instructions.
Common Fault,
Load Control,
5, 6 (optional)
1, 2 (optional)
Engine Start, 3, 4
Ground *
EL1
Red
EL2
Black
GRD *
Uninsul.
N
White
Uninsul.
White
Black
3 4
Red
White/Red
* Ground according to NEC and local codes.
Generator Set
Wiring Harness
Section 2 Installation
tp6397
23