Kohler K-2553 설치 및 관리 매뉴얼 - 페이지 6

{카테고리_이름} Kohler K-2553에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-2553 25 페이지. Wall-mount vanity

Roughing-In/Plan de raccordement/Diagrama de instalación
14-9/16"
20-1/2" (52.1 cm) Max
(37 cm)
Rough-In Plumbing
Supply Stop Location
Emplacement de
raccordement de
plomberie du arrêts
d'alimentation
Lugar de instalación
de la llave de paso
de suministro
Rough-In Plumbing
P-Trap Location
Emplacement de
raccordement de
plomberie de siphon en T
Lugar de instalación
de la trampa en P
9"
(22.9 cm)
11-15/16"
(30.3 cm)
14"
(35.6 cm)
21-7/8" (55.6 cm)
Above
Finished Floor
21-7/8" (55,6 cm)
au-dessus
du sol fini
21-7/8" (55,6 cm)
arriba del
piso acabado
1110179-2-A
21-7/8" (55.6 cm)
Above Finished Floor
8"
21-7/8" (55,6 cm)
(20.3 cm)
au-dessus du sol fini
4" (10.2 cm)
21-7/8" (55,6 cm) arriba
del piso acabado
20-5/8" (57.5 cm)
22-5/8" (60 cm)
K-2553
36-1/4" (92.1 cm) Max
11-15/16"
(30.3 cm)
12"
(30.5 cm)
9" (22.9 cm)
36-3/8" (92.4 cm)
38-3/16" (97 cm)
Rough-In Plumbing
Supply Stop Location
Emplacement de raccordement de
K-2556
plomberie du arrêts d'alimentation
Lugar de instalación de la llave
de paso de suministro
6
14"
(35.6 cm)
9"
(22.9 cm)
14-9/16"
(37 cm)
Rough-In Plumbing
P-Trap Location
Emplacement de
raccordement de
plomberie de
siphon en T
Lugar de instalación
de la trampa en P
Kohler Co.