Kohler TOOBI II 600 설치 지침 매뉴얼 - 페이지 5
{카테고리_이름} Kohler TOOBI II 600에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler TOOBI II 600 6 페이지. Vanity tops & cabinets
INSTALLATION
5
Waste & Tapware
(a) Fit the tapware. Connect the water supply
to the taps and waste pipe to the waste
outlet.
(b) Run hot and cold water and check for leaks.
When satisfied with the results move on to the
next section.
(c) Ensure the drain and faucet assembly is as
shown in Fig. 3.
P Trap
Fig. 3
6 Drawer re-installation
(a) To re-install the drawers, extend the runners
and place the drawer onto the runners.
(b) Gently push the drawer back until you hear
the runners click into place.
50%
Tap
Overflow
7 Sealing
Supply
Lines
(a) All edges MUST be sealed with an approved
Silicone Sealant.
- Between cabinet and wall
- Between the vanity top and wall
Drain
Assembly
Please visit our website for warranty information:
Kohler NZ
www.kohler.co.nz
-5-
INSTALLATION COMPLETE
Kohler Australia
www.kohler.com.au