Kohler TOOBI II 900 설치 지침 매뉴얼 - 페이지 3
{카테고리_이름} Kohler TOOBI II 900에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler TOOBI II 900 6 페이지. Vanity tops & cabinets
CO C ONSTRUCTION REQUIREMENTS
Toobi II cabinets must be fixed to two nogs in the wall, the nog size should be 50 x 75mm.
TOOLS & MATERIALS REQUIRED - (Not Supplied)
TOOLS
To suit pipework
INSTALLATION
1
Drawer removal
(a) Open the drawer until at least 50% of the
drawer extends past the cabinet carcass.
50%
50
To suit screws
-3-
50mm from top of cabinet to centre of nog.
750 - 800
A height of 750 to 800mm from the floor
to the top of the cabinet is recommended.
MATERIALS - Not supplied & must be purchased separately
10g x 75mm
Screws (Refer step 3)
(b) Pull & lift up the drawer until it detaches
from the rails.
20mm
Fixing washers