Aqua 9+ AQ9-50GPD 설치 매뉴얼 - 페이지 5

{카테고리_이름} Aqua 9+ AQ9-50GPD에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aqua 9+ AQ9-50GPD 13 페이지. Natural ionic calcium alkaline water system

Installation Manual ::
Aqua 9+ Natural Ionic Calcium Water System
BOOSTER PUMP INSTALL(OPTIONAL)
UV LIGHT
ULTRAL VIOLET LIGHT(OPTIONAL)
The UV Light can be installed between the post filter and the faucet.

DRAIN CLAMP INSTALLATION

1. The drain clamp should be installed above the trap and on the vertical or horizontal tailpiece
(see figure 2).
2. The hole position on the pipe should be marked and drilled with a 1/4" bit through only one
side of the pipe (see figure 3).
3. Align the drain clamp over the drilled hole and attached to the drain pipe and tighten the two
screws evenly (see figure 4).
5
Copyright © Aqua 9+ Beverage