Avlite AV-SAL-01 설치 및 서비스 매뉴얼 - 페이지 14

{카테고리_이름} Avlite AV-SAL-01에 대한 설치 및 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Avlite AV-SAL-01 20 페이지. Solar area light

AV-SAL-01
Solar Area Light
Regulator Connection & Operation
Fit the Morning Star SS10 regulator into the carrier on the back wall.
Fit the two 55 amp hour battery's in to the shelves in the battery housing.
Important:
The regulator has a connection sequence that must be followed. Please ensure the regulator is
connected in the following sequence.
1. Connect Battery Negative cable to the battery negative terminals on the batteries
2. Connect the Battery Positive cable to the battery positive terminals on the batteries
3. Connect the Solar Negative wire from the solar panel to the regulator
4. Connect the Solar Positive wire from the solar panel to the regulator
5. Connect the Negative Wire from the light head to the load (light) Negative terminal on the regulator
6. Connect the Positive Wire from the light head to the load (light) Positive terminal on the regulator
LOW VOLTAGE
CHARGING
DISCONNECT
TEMP SENSE
SOLAR
BATTERY
LIGHT
SEALED
4
3
2
1
6
5
OR
FLOODED
+
+
+
SELECT
Fig 7. Regulator Diagram
Cover the light head with a dark towel or jacket. Allow a 60 seconds of continuous darkness for the light
to activate.
When the installation is complete, fit the battery housing cover, using 6 x M8 x 25 SHCS.
Latest products and information available at www.avlite.com