ab Solares Smart Spa 설치 매뉴얼 - 페이지 2
{카테고리_이름} ab Solares Smart Spa에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ab Solares Smart Spa 17 페이지.
Failure To Comply With These Items Will Greatly
Compromise The Functionality Of The Bathing Unit And May
• The bathing system is to be installed AFTER all construction and
finish work is completed. The abrasive nature of drywall dust and
construction debris can damage the mechanical components and
finish of the system. If the unit is installed during construction, it is
the installer's responsibility to ensure the system is adequately
protected from such contaminants.
• Flush Hot and Cold water lines prior to connecting to bathing system.
Debris left in the water lines can cause valve failure.
• Allow bathing system to reach room temperature before plugging it
in. Electric components can be sensitive to extreme temperatures.
• Before attempting to remove the side panels, first remove the thumb
screws located behind the personnel access doors located in the
center of each panel.
CD0037
TM
Solares
Smart Spa Installation Manual
Important Installation Highlights
Void The Warranty.
-2-
1121