Aqua Creek Products F-MTY400-T 매뉴얼 - 페이지 10

{카테고리_이름} Aqua Creek Products F-MTY400-T에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aqua Creek Products F-MTY400-T 13 페이지.

1. PHYSICAL POOL LIFT TEST
A physical test of the lift function is required when doing an annual inspection. NOTE: The lift should
always be run through a completed cycle without a load prior to each use. The annual test should be
ran both empty and with a typical load weight to test the lift's functions. Make comments and/or
recommendations in the notes area below each section.
INSPECTION ITEM
1.
With all connections connected, operate the lift through a
complete cycle without weight to confirm the lift is functioning
correctly. Note any strange noises and any unusual operation.
2.
Verify the lift was installed correctly; is the lift free to travel in and
out of the pool without hitting anything like a wall, rail, bench,
etc...
3.
Rotate lift at least 90 degrees over the water and back again if
applicable.
NOTES/RECOMMENDATIONS:
Aqua Creek Products Annual Pool Lift Safety
INSPECTION REPORT
PASS
FAIL
N/A
9/28/2022 1:39:29 PM PAGE - 10