AB Quality ArmorPoint A Series 설치 지침 매뉴얼 - 페이지 4
{카테고리_이름} AB Quality ArmorPoint A Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AB Quality ArmorPoint A Series 13 페이지.
4
ArmorPoint 24V dc Input Modules, Series A
Mount the I/O Base
Publication 1738-IN002B-EN-E - November 2004
To mount the base on a wall or panel, use the screw holes provided
in the base.
IMPORTANT
A drilling dimensions mounting illustration for the base with an
adapter is shown below.
Drilling Dimensions
Adapter
4.02 in.
102 mm
1.81 in.
46 mm
Install the mounting base as follows:
1. Lay out the required points as shown in the drilling dimension
drawing.
2. Drill the necessary holes for #8 (M4) machine or self-tapping
screws.
3. Mount the base using #8 (M4) screws.
4. Ground the system using the ground lug connection. (The
ground lug connection is also a mounting hole.)
Mounting base
The module must be mounted on a grounded metal
mounting plate or other conductive surface.
1.9 in.
2.0 in.
0.87 in.
47.2 mm
50 mm
22 mm
2.0 in.
0.87 in.
2.0 in.
50 mm
22 mm
50 mm
Ground lug connection
43675
Latching mechanism
43769