Aqua FX Octopus RO/DI 지침 및 사용 설명서 - 페이지 2

{카테고리_이름} Aqua FX Octopus RO/DI에 대한 지침 및 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Aqua FX Octopus RO/DI 7 페이지. 6 stage

Congratulations on your acquisition of the Octopus water treatment system from
Aqua Engineering & Equipment. We hope your system brings you many years of service and
Ultra Pure, Fresh, Clean water. There are a few basic steps we wanted to inform you about when
it comes to installation and maintenance of your water treatment system. If you should have any
difficulties or questions, please do not hesitate to contact us, we would be happy to help you in
Your system was
any way we can.
after you follow a few easy steps. Please follow the steps below closely.
1) Unpack your uni t completely. Inspect for any damage or broken parts as a result of
shipping.
2) Unscrew the cap from the right side of the white horizontal canister(s) (RO Membrane
Housing), Remove the
RO Membrane in the white horizontal membrane housing , double O
the
BLUE
first. Repeat for each RO membrane if you have multiple membranes on your RO system.
*DO NOT REMOVE ANY OF THE WRAPPING FROM THE RO MEMBRANE ITSELF
REMOVE THE RO MEMBRANE FROM THE CL E AR PLASTIC PROTECTIVE BAG *
3) Locate and connect the supply side of the equipment. This will be the right side as you
face the system. Only feed the unit from the
WATER as this will melt your membrane. Connect the (1/4") BLACK tubing to the
water supply type you have specified. (IE The Feed adaptor)
4) Locate the Y
Y
e
Y
e
e
loop on the drain exit of the unit. Then place opposite end of the tube in an appropriate
area for drainage when the unit is operating
5) Connect the
switch that has a 2" length of Blue tube attached. Plug the opposite end of the pressure
switch into the left most canister f or your treated water , When installing a RO, Octopus‟
(Not RO/DI) your High Pressure Switch will be installed and you will simply just plug
your product line into the High pressure switch
of the
BLUE
line to an externa l float or other method of flow control (like a ball valve)
6) Once installed, slowly turn on the water and check for leaks. Then proceed to plug in the
power chord provided to an electrical outlet. The controller will begin its operations
(discussed in d etail below) I t is recommended for RO/DI Octopus‟ that you remove the
DI from its canister and allow the unit to run for an initial 15 minutes, (skip to step 7 at
this point to create RO product water, if you don‟t restrict the „T‟ valve you will not see
any product water!) both RO and RO/DI Octopus‟ should discard both the product and
the drain water for the 15 minutes (assuming you have removed your DI) . You can then
reinstall the DI into its original position. The reason for this exercise is to prevent t he DI
from premature exhaustion from the RO membranes initial manufacturers preservative,
Sodium Meta - Bisulfate.
7)
IMPORTANT STEP
loop is a „T‟ flow restrictor , This valve will be mostly open as you see it , slowly close
(restrict) the valve until either:
a) 80 psi is reached on the pressure gauge
b) The 1:1 waste water ratio is reached.
The system should not be run at any pressure exceeding 80 psi. If the unit is run at any
pressure exceedi ng 80 psi, this will void all manufacturers‟ warranties.
You can now hook your unit into an Aqua Engineering & Equipment Float Valve or
8)
other type of external control, and begin making pure water!
Octopus Installation Instructions
custom built to
B LU E
RO Membrane from the clear plastic wrapper and insert
l
l
o
w
drain line, and install on the open T coming off of the Y
l
l
o
w
l
l
o
w
(1/4)" product line that is provide d
BLUE
: Locate the Y
Y
e
Y
e
e
order, and it is now ready to be installed
water supply , DO NOT USE
COLD
.
,
You can now hook up the opposite end
.
l
l
o
w
drain line flush loop again , on the top of the
l
l
o
w
l
l
o
w
-
, ONLY
e
l
o
w
Y
e
l
l
o
e
l
l
o
in to the black High Pressure
*Or*
Ring end
HOT
l
w
w
flush
.