DeZurik APCO CVS-6000 설치, 운영 및 유지보수 매뉴얼 - 페이지 4

{카테고리_이름} DeZurik APCO CVS-6000에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DeZurik APCO CVS-6000 19 페이지. Swing check valves
DeZurik APCO CVS-6000에 대해서도 마찬가지입니다: 설치, 운영 및 유지보수 매뉴얼 (11 페이지)

DeZurik APCO CVS-6000 설치, 운영 및 유지보수 매뉴얼
DeZURIK
APCO CVS-6000 Swing Check Valves

Description

A swing check valve consists of a valve body, a bonnet, and a disk that is connected to a hinge. The
disk swings away from the valve-seat to allow flow in the forward direction, and returns to valve-seat
when upstream flow is stopped, to prevent backflow.
The CVS-6000 valve is equipped with a weighted counterweight arm and Air Cushion Cylinder, the
CVS-6000B valve is equipped with a weighted counterweight arm and Oil Control Bottom Buffer and
the Series 6100 valve is equipped with a weighted counterweight arm and Oil Cushion Cylinder to
assist with closing the valve.

Handling and Storage

Lifting the valve improperly may damage it. Do not fasten lifting devices to the cylinder or through the
seat opening in the body. Lift the valve with slings, chains or cables fastened around the valve body, or
fastened to bolts or rods through bolt holes in the flanges.
If installation will be delayed, place valve indoors in secure, weather tight storage. If temporary outside
storage is unavoidable, make sure a vermin proof rain cover (water shedding tarp, etc.) is secured
around/over the valve to keep off rain and mud. Skid and set the assembly on a flat, solid, and well
drained surface for protection from ground moisture, runoff and pooled rain water.

Installation

The APCO CVS-6000 Swing Check Valves may be installed in a horizontal or vertical position
(with the flow upward). In either case, the Counterweight Arm (44) should be set 25°-30° below
the horizontal line. Unless otherwise specified, the valves are shipped for horizontal installation.
On the Series CVS-6000B and CVS-6100 valves, the Oil Reservoir (58) and on the Series
6000B valve, the Hydro-pneumatic Accumulator (73) must be mounted vertically regardless of
the valve installation position.
Before installation, remove foreign material such as weld spatter, oil, grease, and dirt from the
pipeline.
Prepare pipe ends and install valves in accordance with the pipe manufacture's instructions for
the joint used.
Do not deflect the pipe-valve joint. Minimize bending stresses in the valve end
connection with pipe loading.
If excessive seat leakage occurs during start-up, recheck the installation and
eliminate any distortion to the valve body.
Ensure the valve and pipeline flanges are concentric to ensure proper flange sealing and seat
leakage control.
Tighten the flange bolts or studs in a crisscross pattern and minimum of four stages.
D12006
Page 4
December 2012