Aqua One Shades 2+2 Cabinet 조립 지침 매뉴얼 - 페이지 11

{카테고리_이름} Aqua One Shades 2+2 Cabinet에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aqua One Shades 2+2 Cabinet 20 페이지.

Step 18
Prepare the Rail
a:
Fit the Bracket to the
mark-hole in the Rail
using a 13mm Screw.
b:
Rail
Insert 2
Locking
Cam Nuts into the Rail.
Step 19
Step 8
Fit the Rail to the Right
Side
Push the Rail onto the
Right Side.
Use a screwdriver to
tighten the Large Locking
Cam Nuts fitted to the
Rail.
Step 20
Step 8
Prepare the Base
Insert 4
Locking
Cam Nuts into the Base.
a:
b:
E
F
8
E
F
F
Finished
Front Edge
L
Finished
Front Edge
N
10
E
10
Finished
Front Edge
10
E
E
13
L
N
F
E
F
F