Allied Telesis CentreCOM GS980M/52PS 빠른 설치 매뉴얼 - 페이지 14
{카테고리_이름} Allied Telesis CentreCOM GS980M/52PS에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Allied Telesis CentreCOM GS980M/52PS 20 페이지. Gigabit ethernet switches
3. Plug the other end of the power cord into an appropriate AC
power source.
4. Wait two minutes for the switch to initialize its management
software.
5. Verify that the POWER LED is green. If the LED is OFF, see
"Troubleshooting" on page 18.
LEDs
Ethernet Copper Port LEDs
The Ethernet copper port LEDs on the switches are described here.
Speed/Activity LEDs
Speed/Activity LEDs
Solid
The port has established a 1Gbps link to a network
Green
device.
Flashing
The port is transmitting or receiving packets at 1Gbps.
Green
Solid
The port has established a 10 or 100Mbps link to a
Amber
network device.
14
CentreCOM GS980M Series Quick Installation Guide
Duplex Mode
or PoE+ LEDs